Purpose:
Section titled “Purpose:”Standardize and provide process to successfully design, quote and provide supportable data for a project
Scope:
Section titled “Scope:”All areas of the organization are affected by this process, including revenue generating activities found in other processes
Responsibility:
Section titled “Responsibility:”Design Desk
Definitions:
Section titled “Definitions:”- Halo and Planner will be kept up to date with agreed upon project requests to be worked on
- All notes, data collection and information gathering pertinent to project design will be stored in respective Teams channel chat, files and OneNote tab
Procedure:
Section titled “Procedure:”Revenue meeting:
- Previous sprint recap
-
Review of completed PR / Quotes
-
Review of pending-completion PR /Quotes
- Define next sprint
- Confirm with vCIO’s of what PR’s to be add to current sprint based off Priority level
- PR/Quote status follow-up
-
Follow up with vCIO’s on the status of open quotes
-
Follow up with vCIO’s on the status of PR’s that are in the following statuses: Draft, On-Hold, Requote requested
PR review:
- Review PR and define next steps
-
Review data submitted to PR and define if enough information has been provided to be able to start scoping.
-
If not enough information has been provided, define the list of information needed to be able to start scoping.
- Validate PR data
-
Confirm data provided in PR meets the requirements needed to execute this requested project.
-
If not enough information has been provided, define the list of information needed to be able to start scoping.
- Validate client existing documentation
- Confirm client has up to date documentation needed to support this project
- Collect additional data/requirements
-
Provide list of information needed to vITM / vCIO in its designated Teams Space and request to be answered
-
If required, request a call with vITM / vCIO to discuss additional information required
- Accept to be added to sprint
Design:
- Start scope build out via template (if applicable)
-
Create copy of Project template
-
Update project phases and tasks as applicable
-
Create net new phases and tasks to support goal of project
-
Add notes to phases and tasks to provide context towards the expected outcome
-
Change PR status to Design Scoping
- Define scope dependencies (ex. Discovery of: Server requirements, implementation requirements, etc.)
-
Validate / audit existing configurations to help define project execution method and BOM
-
Define requirements needed to execute this project (ex. New/Update configurations, network, server, infrastructure, etc.)
- Define / update labor and resourcing
-
Update how much labor effort will be required to execute all project phases and tasks, including standard project tasks (PM, Contingency, etc.)
-
(If applicable) Update which engineer role resource would be executing which task
- Define BOM
-
Identify required Hardware/Cloud Resources/Licensing/Software needed to execute this project. This is based off:
-
Goal’s requested in PR
-
Data provided in PR
-
Validated information during discovery
-
Requirements identified during discovery
-
Vendor provided requirements
-
Work with vendor / distribution on BOM requirements
- Design collaboration (ex. Vitm, vcio, sme, vendor, etc.)
-
Work with both internal and external resources, where applicable, to create proper design
-
Discuss options and methods of executions to which will result in an agreed upon expected outcome
- Design review with vitm, vcio, sme, etc. (if applicable)
- Go over created design to confirm requested and discussed outcomes will be accomplished
- Create / Finalize supporting data (Reporting, lists, WI, etc.)
-
Complete any supporting data needed to execute project.
-
Examples include where applicable: Server list with resources, supporting pictures of gear / network rooms / etc., proposed network diagram, supportable configuration documents, supporting information for network deployments, etc.
-
Upload data to client’s project request space
- Finalize scope
- Adjust scope if needed based off any new information provided, outcomes of design collaboration, and/or review.
Scope review:
- Collaboration review (ex. QA, vitm, PM, etc.)
-
Change PR status to Design Review
-
Submit scope to client space to be QA’d
-
Upon scope design approval, send to PM to update resourcing
-
Change PR status to Design Approved
-
PM will then give the green light for quoting
-
Change PR status to Quoting
- Update scope (if applicable)
- Should there be any updates discovered during QA, update scope/BOM.
- Update supporting data (if applicable)
- Should there be any updates discovered during QA, update necessary documentation.
Quoting (steps):
- Create quote
- Add project file phases/tasks to quote
- Add project goal/notes/assumptions to quote
- Calculate labor and apply to quote
- Add BOM to quote
- Update margins
- Create opportunity
- Finalize and post quote
Close PR (steps):
- Add quote link to PR
- Change status to Ready for Client
Effectiveness Criteria:
Section titled “Effectiveness Criteria:”- Validating proper documentation, information and requirements are provided during this process by defined parties
- PR’s are up to date with required fields: template, goals, priority status, requested dates
- Teams channel is up to date with all pertinent information and documentation to support potential future project
- Clear and accurate Quote and design scope is provided in teams channel
References:
Section titled “References:”- N/A
Process References:
Section titled “Process References:”- Link to process map.
Note: Please add KB relationships to core process, process. SOPs or other WIs on the right.